Featured Projects

Advanced Chemistry Laboratory – Analytical Chemistry Lab Wing Addition

Advanced Chemistry Laboratory – Analytical Chemistry Lab Wing AdditionThe new 11,000 sq. ft. of laboratory space and 12,000 sq. ft. of administrative space. The primary facilities were built in phase II
includes surface science, materials sciences, point detection, decontamination and chemistry laboratories.

General Contractor: John C Grimberg Company
Project Cost: $1,300,000
Completion Date: June 2013

Armed Forces Retirement Home – New Commons and Healthcare Center

Armed Forces Retirement Home – New Commons and Healthcare CenterThe new 150,000 square foot building, currently named the New Commons & Healthcare Center, will include features such as a media room, pool, game room, artist colony, and rooftop garden. Also housed in this LEED certified building will be medical facilities, dining areas, the post office, a fitness center and other recreational spaces, used daily by all of the residents. Besides these gathering spaces, there will be floors dedicated to residents who require long term care and memory support.

General Contractor: Hensel Phelps Construction Company
Project Cost: $7,600,000
Completion Date: July 2013

Asymmetric Warfare Group Brigade Complex

Asymmetric Warfare Group Brigade ComplexConstruction of the Asymmetric Warfare Group (AWG) Brigade Complex located Fort George G. Meade, MD. General Contractors interested in this announcement should have knowledge and experience to construct design-bid-build administrative and automotive maintenance facilities with phased occupancy of facilities. The project consists of the construction of 3 buildings. The three (3) of the buildings are to be located within the current AWG Campus. The buildings include, the Headquarters building is approximately 75,000 sq. ft., a Visitor Control Center (VCC) approximately 2,700 sq. ft., a Vehicle Maintenance/Fabrication Facility approximately 7,000 sq. ft. This project also includes the demolition of 3 buildings to be phased with construction activities.

General Contractor: Skanska USA
Project Cost: $6,200,000
Completion Date: August 2015

Defense Media Activity

Defense Media ActivityDMA is the department’s direct line of communication for news and information to U.S. forces worldwide. The agency presents news, information and entertainment through media outlets, including radio, TV, Internet, print media and emerging media technologies. DMA services millions of service members, reservists, civilian employees and military retirees and their families in the U.S. and abroad. DMA also includes Stars and Stripes newspaper and the Defense Information School. DMA is a state-of-the art, 185,000-square-foot headquarters building, costing $56 million located at Fort Meade. The project also included a remote antenna facility. The facility also has a goal to obtain LEED Silver certification and houses more than 650 employees.

General Contractor: Hensel Phelps Construction
Project Cost: $19,600,000
Completion Date: May 2011

Dorsey Run Correctional Facility – Phase I

Dorsey Run Correctional Facility – Phase IThis project was a Design-Build services for this new correctional facility for the Maryland Correctional Pre-Release System at Jessup, Anne Arundel County, Maryland. The project includes functions of housing, administration, security, education, food services, visiting and support for approximately 560 inmates. The first phase provided a new East Compound which includes two two-story, 280 bed housing units, one story support services building, a recreation yard, perimeter fence system with sally port and entrance security post, access roads and parking area, totaling approx. 159,000 gross sq. ft. of building area. The building features visitor center, medical and dental facility, pharmacy and administration areas as well as a kitchen and dining areas. The facility also has a goal to obtain LEED Silver certification.

General Contractor: PJ Dick
Project Cost: $4,150,000
Completion Date: September 2013

Fort Belvoir New Commissary Facility

Fort Belvoir New Commissary FacilityThe Defense Commissary Agency, Acquisition Management Directorate, Construction Design Branch (HQ DeCA/LEAAF), a new 141,847 square-foot commissary at Fort Belvoir, Virginia. The primary function of the new facility will be to provide sales and processing of miscellaneous commodities and grocery items for the military community of the installation. The bullets below depict the general nature of the work. The building includes, new store: A new single-story commissary facility with mezzanine for administration offices, loading-dock equipment, refrigeration system, fire-protection system, plumbing, mechanical, and electrical work. The sales area includes: Meat, dairy, frozen, produce, deli, bakery, grocery departments, and their refrigerated display cases. Food preparation and storage areas including prefabricated coolers and freezers. Mezzanine level administrative offices/storage areas with elevator.

General Contractor: Hoar Construction
Project Cost: $3,600,000
Completion Date: August 2016

Ft. Meade Exchange

Ft. Meade ExchangeThe new main store has been under construction since 2012 and replaces a 40-year-old facility. Fort Meade Exchange At the 166,869-square-foot-store, Soldiers, retirees and their families will find special concept shops for top brands, including Michael Kors, Ralph Lauren, The North Face, Columbia, Victoria’s, Tactical Shop, Floral Shop, Paul Mitchell Salon and Pro Image Sports, which sells jerseys, caps and other memorabilia. As another convenience to military shoppers, Fort Meade’s pharmacy has also moved inside the mall. The new food court is serving up something for everyone. Denny’s Fresh Express and Boston Market represent each of those chain’s second locations on military installations. Domino’s, Starbucks, Charley’s and Subway round out the offerings.

General Contractor: Walbridge
Project Cost: $3,660,000
Completion Date: November 2014

Hereford High School – Phase I

Hereford High School – Phase IThe 58,000 sq. ft. renovation included demolition of lighting, and power equipment. Installation of new lighting package, lighting control system, power to new mechanical equipment, cable tray, telecommunication system, electrical panel boards, and lightning control system.

General Contractor: Towson Mechanical
Project Cost: $1,077,000
Completion Date: January 2014

Meade High School – Open Classroom Enclosure Project

Meade High School – Open Classroom Enclosure ProjectProvide full height walls, modification of ceilings, lighting systems, fire alarm, public address systems, and HVAC systems as required to meet current codes. This project is 56,700 sq. ft.

General Contractor: Phillips Way
Project Cost: $ 1,050,000
Completion Date: April 2016

NASA Goddard Flight Center – Renovation of Building 26

NASA Goddard Flight Center – Renovation of Building 26 The Building 26 contract involved the conversion of the 50,000-square-foot building into an operations and secure mission analysis facility to house the Goddard Space Flight Center’s highest-ranking personnel. The LEED Silver renovation included the construction of office and support facilities, Sensitive Compartmented Information Facility (SCIF) space, a weapons storage room, and secure evaluation rooms, as well as the replacement of all building systems and equipment, including lighting complete power, fire alarm and mass notification system, lighting control system, stand by generator, lightning protection system.

General Contractor: John C Grimberg
Project Cost: $2,300,000
Completion Date: July 2013

METU Renovation @ Walter Reed Navel Medical Center
(Medical Wing for the top Government Official)

METU Renovation @ Walter Reed Navel Medical CenterThe project modernized the Medical Evaluation Treatment Unit (METU) Suite consisting of 12,000+ square feet of space. The existing METU Suite and associated support spaces will be expanded and renovated to accommodate current and future functional requirements, as well as conform to current codes and standards, the project including surgery center, intensive care unit, patent room, stand by generator. Project includes a complete electrical installation, electronic security system, interior fire alarm and mass notification system, telecommunication, CCTV system.

General Contractor: Allen & Shariff Construction Services, LLC
Project Cost: $1,300,000
Completion Date: August 2015

National Cancer Institute – Data Center

National Cancer Institute – Data CenterThe interior project consists of 90,000 sq. ft. data center in addition to supporting the science applications, Internet, employee and laboratory workstations, and other data processing needs throughout the facility, the ATRF data center will use a voice over Internet protocol (VoIP) system to support voice and multimedia communications requirements.

General Contractor: John C. Grimberg
Project Cost: $6,200,000
Completion Date: September 2012